01
New wells.
For new builds and bare land. We walk the lot, check the setbacks from your lines and your septic, pull the logs for the wells around you, and file the state permit. Then we case through the loose ground and drill into rock until the well reaches water worth keeping.
- Site visit and well-log research
- IDWR permit filed for you
- Steel casing through soil and gravel
- Flow test, gallons a minute on record